Systems to optimise conversion efficiencies at Ontario Hydro´s hydroelectric plants
Author
Galiana, Francisco D.
fYear
1997
fDate
11-16 May 1997
Firstpage
245
Lastpage
251
Abstract
Optimal dispatch systems at hydroelectric power plants manage the energy conversion process such that, under all conditions, the station efficiency is maximised. This paper describes an optimal dispatch system which has proven to be successful at two installations, one on the Nipigon river controlling three stations near Thunder Bay, Ontario, and the other at R.H. Saunders generating station on the St. Lawrence river near Cornwall, Ontario, Canada. The validated benefits amount to 15GWh per year, which is about 0.25% of the annual production at the respective stations. Secondary benefits arising from this system include increased decision making assistance, improved accessibility to plant data and an overall improvement in operational performance
Keywords
control system analysis; economics; hydroelectric power stations; load dispatching; optimal control; power station control; power station load; Canada; decision making assistance; energy conversion process; hydroelectric power plants; operational performance; optimal dispatch systems; plant data accessibility; Control systems; Decision making; Energy conversion; Energy management; Hydroelectric power generation; Meeting planning; Optimal control; Power generation economics; Production; Rivers;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Industry Computer Applications., 1997. 20th International Conference on
Conference_Location
Columbus, OH
Print_ISBN
0-7803-3713-1
Type
conf
DOI
10.1109/PICA.1997.599403