DocumentCode
2895958
Title
Field Reliability of D.C. Power Plants for Telecommunication Systems
Author
Grossoni, Maurizio ; Rizzi, Luigi
Author_Institution
SIP SocietÃ\xa0 Italiana per I´´Esercizio delle, Telecomunicazioni s.p.a., Roma - Italy
fYear
1987
fDate
14-17 June 1987
Firstpage
671
Lastpage
676
Abstract
Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.
Keywords
Batteries; Diodes; Instruments; Power distribution; Power generation; Power system reliability; Pulse width modulation converters; Rectifiers; Telecommunications; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1987. INTELEC '87. The Ninth International
Conference_Location
Stockholm, Sweden
Print_ISBN
91-7810-916-7
Type
conf
DOI
10.1109/INTLEC.1987.4794636
Filename
4794636
Link To Document