The installation and commissioning of the Australian Synchrotron Storage Ring RF System (SR RF System) was completed. SR RF System consists of four sets of 500 MHz 150 kW-CW klystron and 750 kV normal conducting cavity. After the cavity aging, the RF System achieved 48 hours continuous operation in November 2006. The paper will present the design and commissioning results.
Keywords
accelerator RF systems; accelerator cavities; commissioning; installation; klystrons; storage rings; synchrotrons; Australian Synchrotron Storage Ring RF System commissioning; SR RF System; conducting cavity; frequency 500 MHz; installation; klystron; voltage 750 kV; Australia; Circuits; Control systems; Heating; Klystrons; Radio frequency; Storage rings; Strontium; Synchrotrons; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4440975
Filename
4440975
Link To Document