• DocumentCode
    2898444
  • Title

    Pilot project to estimate the centralized volt/VAr control effectiveness

  • Author

    Roytelman, I. ; Wee, B.K. ; Lugtu, R.L. ; Kulas, T.M. ; Brossart, T.

  • Author_Institution
    Siemens Power Syst. Control, MN, USA
  • fYear
    1997
  • fDate
    11-16 May 1997
  • Firstpage
    340
  • Lastpage
    345
  • Abstract
    This paper describes a volt/VAr control (VVC) project in which a centralized network-model based VVC was put in place to control a 13.8 kV distribution subsystem. The goal of the project is to estimate the effectiveness of VVC based on different objective functions, including an objective function for future market economy (revenue maximization). The technical issues which are critical to implementing the VVC are discussed. The effectiveness of VVC for energy conservation and revenue maximization is calculated as an effect due to the immediate (within the span of a few minutes) load to voltage response. This effect is compared with the actual effect calculated based on a fifteen minutes average archived telemetered data
  • Keywords
    centralised control; control system analysis; control system synthesis; distribution networks; economics; energy conservation; power system control; reactive power control; voltage control; 13.8 kV; 15 min; centralized volt/VAr control; control design; control simulation; distribution subsystem; energy conservation; load-to-voltage response; objective functions; pilot project; revenue maximization; Admittance; Centralized control; Costs; Optical wavelength conversion; Reactive power; Reactive power control; Substations; System testing; Topology; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Industry Computer Applications., 1997. 20th International Conference on
  • Conference_Location
    Columbus, OH
  • Print_ISBN
    0-7803-3713-1
  • Type

    conf

  • DOI
    10.1109/PICA.1997.599423
  • Filename
    599423