• DocumentCode
    2899614
  • Title

    Manufacture and assembly of the 6-meter-long cryomodules for superconducting RF Test Facility (STF) at KEK

  • Author

    Semba, Tomoyuki ; Kajiura, Soji ; Masumoto, Takashi ; Tagawa, Toshiyuki ; Itou, Yutaka ; Hayano, Hitoshi ; Hisamatsu, Hiromi ; Masuzawa, Mika ; Noguchi, Shuichi ; Ohuchi, Norihito ; Saito, Kenji ; Terashima, Akio ; Tsuchiya, Kiyosumi

  • Author_Institution
    Hitachi Ltd., Hitachi
  • fYear
    2007
  • fDate
    25-29 June 2007
  • Firstpage
    2122
  • Lastpage
    2124
  • Abstract
    A superconducting RF test facility (STF) is being constructed at KEK for R&D oriented toward the International Linear Collider (ILC). Under KEK´s guidance, Hitachi, Ltd. has manufactured cryostat components at its factory and completed final assembly in the STF Linac Building at KEK. The STF cryomodule consists of two cryostats, each about six meters long based on the TESLA-TTF-type III design. Each cryostat can house four 9-cell cavities, each one meter in length. This report outlines the flow of manufacturing from the factory to final assembly, and describes the manufacturing of equipment, assembly precision, and other matters.
  • Keywords
    accelerator RF systems; accelerator cavities; cryostats; linear colliders; 9-cell cavities; ILC; International Linear Collider; STF linac; TESLA-TTF-type III design; cryomodules; cryostat components; superconducting RF test facility; Assembly; Couplers; Cryogenics; Helium; Linear particle accelerator; Manufacturing; Production facilities; Radio frequency; Test facilities; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2007. PAC. IEEE
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0916-7
  • Type

    conf

  • DOI
    10.1109/PAC.2007.4441170
  • Filename
    4441170