DocumentCode
2899614
Title
Manufacture and assembly of the 6-meter-long cryomodules for superconducting RF Test Facility (STF) at KEK
Author
Semba, Tomoyuki ; Kajiura, Soji ; Masumoto, Takashi ; Tagawa, Toshiyuki ; Itou, Yutaka ; Hayano, Hitoshi ; Hisamatsu, Hiromi ; Masuzawa, Mika ; Noguchi, Shuichi ; Ohuchi, Norihito ; Saito, Kenji ; Terashima, Akio ; Tsuchiya, Kiyosumi
Author_Institution
Hitachi Ltd., Hitachi
fYear
2007
fDate
25-29 June 2007
Firstpage
2122
Lastpage
2124
Abstract
A superconducting RF test facility (STF) is being constructed at KEK for R&D oriented toward the International Linear Collider (ILC). Under KEK´s guidance, Hitachi, Ltd. has manufactured cryostat components at its factory and completed final assembly in the STF Linac Building at KEK. The STF cryomodule consists of two cryostats, each about six meters long based on the TESLA-TTF-type III design. Each cryostat can house four 9-cell cavities, each one meter in length. This report outlines the flow of manufacturing from the factory to final assembly, and describes the manufacturing of equipment, assembly precision, and other matters.
Keywords
accelerator RF systems; accelerator cavities; cryostats; linear colliders; 9-cell cavities; ILC; International Linear Collider; STF linac; TESLA-TTF-type III design; cryomodules; cryostat components; superconducting RF test facility; Assembly; Couplers; Cryogenics; Helium; Linear particle accelerator; Manufacturing; Production facilities; Radio frequency; Test facilities; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2007. PAC. IEEE
Conference_Location
Albuquerque, NM
Print_ISBN
978-1-4244-0916-7
Type
conf
DOI
10.1109/PAC.2007.4441170
Filename
4441170
Link To Document