DocumentCode :
2900703
Title :
Exploitation on the Knowledge Transfer of the Time-Cost Optimization
Author :
Wan, Lijun ; Wang, Yang
Author_Institution :
Harbin Normal Univ., Harbin, China
fYear :
2009
fDate :
24-26 Nov. 2009
Firstpage :
1335
Lastpage :
1338
Abstract :
The converting of tacit knowledge is the key of enterprise knowledge management. It facilitates the knowledge transferring between the contractor and subcontractors. Based on the difficulties in the process of knowledge transfer, this paper has focused on the manifesting the implicit knowledge by using the comparisons method. This paper emphatically introduces a series of institutional innovations including adjusting for optimized expenses curve, redrawing the net diagram and redefine total costs. It is also shown that the interests´ mechanism is the solid foundation in the process of manifesting. In addition, other countermeasure and safeguard measure were provided.
Keywords :
knowledge management; optimisation; organisational aspects; subcontracting; enterprise knowledge management; institutional innovations; knowledge transfer; subcontractors; tacit knowledge; time-cost optimization; Cost function; Engineering drawings; Information technology; Knowledge management; Knowledge transfer; Optimization methods; Project management; Solids; Subcontracting; Technological innovation; knowledge exploitation; knowledge transfer; time-cost optimization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Sciences and Convergence Information Technology, 2009. ICCIT '09. Fourth International Conference on
Conference_Location :
Seoul
Print_ISBN :
978-1-4244-5244-6
Electronic_ISBN :
978-0-7695-3896-9
Type :
conf
DOI :
10.1109/ICCIT.2009.221
Filename :
5368485
Link To Document :
بازگشت