• DocumentCode
    2901143
  • Title

    Managing ASIC projects

  • Author

    Nguyen, R.B.

  • Author_Institution
    Gen. Dynamics, San Diego, CA, USA
  • fYear
    1990
  • fDate
    17-21 Sep 1990
  • Abstract
    The elements of a successful ASIC (application-specific integrated circuit) project, from the front-end development point of view, are discussed. Personnel requirements and training, vendor and tool selection, project specification, and scheduling and budgeting are considered in detail. A successful project requires detailed planning and must be executed with strict management discipline
  • Keywords
    application specific integrated circuits; management; personnel; scheduling; training; ASIC projects; application-specific integrated circuit; budgeting; front-end development; planning; project specification; scheduling; tool selection; training; vendor selection; Application specific integrated circuits; Costs; Design methodology; Financial management; Integrated circuit technology; Job shop scheduling; Management training; Personnel; Project management; Quality management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    ASIC Seminar and Exhibit, 1990. Proceedings., Third Annual IEEE
  • Conference_Location
    Rochester, NY
  • Type

    conf

  • DOI
    10.1109/ASIC.1990.186087
  • Filename
    186087