DocumentCode :
2906814
Title :
Project summary of Three Gorges´ 840MVA Hydro-generator with Close-Loop-Self-Circulating Evaporative Cooling System
Author :
Jiayi Yuan ; Dawei Meng ; Guobiao Gu ; Fuchuan Song ; Tianpeng Zhang
Author_Institution :
Harbin Univ. of Sci. & Technol., Harbin, China
fYear :
2013
fDate :
26-29 Oct. 2013
Firstpage :
511
Lastpage :
514
Abstract :
In December 2011 and July 2012, two sets of 840MVA Hydro-generator of Three Gorges on Yangtze River with Close-Loop-Self-Circulating Evaporative Cooling (CLSCEC) System were put into commercial operation. In this paper, we make engineering summary of these two generators with CLSCEC System. We also make a comparison between the internal water cooling (IWC) hydro-generator used in Three Gorges power plant and the CLSCEC hydro-generator in fields of their operating characteristics, working performances, technical features, working safety and reliability. In addition, engineering structures, type test results and systematic emulating calculation of CLSCEC schemes are analyzed.
Keywords :
cooling; hydroelectric generators; power generation reliability; CLSCEC system; IWC; Three Gorges hydrogenerator; Yangtze River; apparent power 840 MVA; close-loop-self-circulating evaporative cooling system; engineering structures; internal water cooling; operating characteristics; reliability; systematic emulating calculation; technical features; type test results; working performances; working safety; Bars; Cooling; Generators; Heat engines; Liquids; Stator cores;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Machines and Systems (ICEMS), 2013 International Conference on
Conference_Location :
Busan
Print_ISBN :
978-1-4799-1446-3
Type :
conf
DOI :
10.1109/ICEMS.2013.6713114
Filename :
6713114