• DocumentCode
    2907999
  • Title

    Generating Unit Maintenance Scheduling using Hybrid PSO Algorithm

  • Author

    Park, Young-Soo ; Kim, Jin-Ho ; Park, June-Ho ; Hong, Jun-Hee

  • Author_Institution
    Pusan Nat. Univ., Busan
  • fYear
    2007
  • fDate
    5-8 Nov. 2007
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper addresses a hybrid particle swarm optimization-based approach for solving a generating unit maintenance scheduling problem (GMS). We focus on the power system reliability such as reserve ratio better than cost function as the objective function of GMS problem. It is shown that particle swarm optimization-based method is more effective in obtaining feasible schedules such as GMS problem related to power system planning and operation. In our paper, we find the optimal solution of the GMS problem within a specific time horizon using hybrid PSO algorithm, simple modification to the standard particle swarm optimization adding mutation operator of GA to solve the stagnation problem. Actual data obtained from the IEEE reliability test system (1996) including 32-generators are applicable to the GMS problem. From the result, we can conclude that the hybrid PSO is enough to look for the optimal solution effectively in the generating unit maintenance scheduling problem. It is also envisaged that hybrid PSO (HPSO) algorithm can be easily implemented for similar optimizations and scheduling problems in power system problems to obtain improved solutions.
  • Keywords
    particle swarm optimisation; power generation planning; power generation reliability; power generation scheduling; IEEE reliability test system; generating unit maintenance scheduling; hybrid PSO algorithm; hybrid particle swarm optimization-based approach; power system planning; power system reliability; stagnation problem; Cost function; Genetic mutations; Hybrid power systems; Maintenance; Optimization methods; Particle swarm optimization; Power system planning; Power system reliability; Scheduling algorithm; System testing; Generating unit maintenance scheduling; Hybrid PSO; Reserve ratio leveling; System reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems Applications to Power Systems, 2007. ISAP 2007. International Conference on
  • Conference_Location
    Toki Messe, Niigata
  • Print_ISBN
    978-986-01-2607-5
  • Electronic_ISBN
    978-986-01-2607-5
  • Type

    conf

  • DOI
    10.1109/ISAP.2007.4441692
  • Filename
    4441692