DocumentCode :
2914744
Title :
Data Path Synthesis With Global Time Constraint
Author :
Nedungadi, Prashant P. ; Balakrishnan, M. ; Kumar, Anshul
Author_Institution :
CSE Department, IIT Delhi
fYear :
1992
fDate :
4-7 Jan 1992
Firstpage :
322
Lastpage :
323
Keywords :
Bismuth; Control systems; Costs; Flow graphs; Iterative algorithms; Libraries; Processor scheduling; Scheduling algorithm; Testing; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
VLSI Design, 1992. Proceedings., The Fifth International Conference on
ISSN :
1063-9667
Print_ISBN :
0-8186-2465-5
Type :
conf
DOI :
10.1109/ICVD.1992.658071
Filename :
658071
Link To Document :
بازگشت