Abstract
National Defense Projects suffer from risks in technical challenges, unstable system requirements, missing schedule milestones, unpredictable funding and cost overruns. A national defense project risk management system (NDPRMS) is a risk information-centric system which is used to avail the National Defense project manager of the project management process. Based on the work flow of national defense project experts´ risk analysis process, we are developing the design guidelines for the risk management engineers and domain specialists. Specifically, we discuss NDPRMS mission objectives and lay out some key techniques associated with the development of functional module, such as knowledge representation, case based reasoning, matching case from the case database. Finally, we relate NDPRMS operational mechanism to user´s work flow, and propose computerized steps of risk management.
Keywords
case-based reasoning; knowledge representation; military computing; project management; risk management; case based reasoning; case database; cost overrun; knowledge representation; mission objective; national defense project risk management system; risk analysis; risk information-centric system; schedule milestone; technical challenge; unpredictable funding; unstable system requirement; Computerized monitoring; Costs; Databases; Design engineering; Guidelines; Intelligent systems; Project management; Risk analysis; Risk management; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Grey Systems and Intelligent Services, 2007. GSIS 2007. IEEE International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-1294-5
Electronic_ISBN
978-1-4244-1294-5
Type
conf
DOI
10.1109/GSIS.2007.4443500
Filename
4443500
Link To Document