DocumentCode
2924057
Title
Establishing and verifying the Norwegian absolute ACV
Author
Slinde, H.
Author_Institution
Justervesenet, Kjeller, Norway
fYear
1998
fDate
6-10 July 1998
Firstpage
29
Lastpage
30
Abstract
Automatic set-ups for comparison of AC-DC transfer standards and generation of absolute ACV have been developed. The set-ups are controlled by modern Microsoft Windows NT compatible software. The methods used and the set-ups are successfully tested in three international intercomparisons. Results are given.
Keywords
calibration; computerised instrumentation; digital instrumentation; measurement uncertainty; transfer standards; voltage measurement; AC-DC transfer standards; Microsoft Windows NT compatible software controlled; Norwegian absolute AC voltage standard; analogue bridge method; automatic set-ups; calibration; digital bridge method; international intercomparisons; thermal convertors; traceability; uncertainties; vacuum relays; verification; Automatic control; Connectors; Frequency; Modems; Resistors; Standards development; Switches; Testing; Uncertainty; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Precision Electromagnetic Measurements Digest, 1998 Conference on
Conference_Location
Washington, DC, USA
Print_ISBN
0-7803-5018-9
Type
conf
DOI
10.1109/CPEM.1998.699743
Filename
699743
Link To Document