DocumentCode
2925088
Title
Risk management practices in IT outsourcing projects
Author
Aris, Syaripah Ruzaini Syed ; Arshad, Noor Habibah ; Mohamed, Azlinah
Author_Institution
Faculty of Information Technology and Quantitative Science (FTMSK), Universiti Teknologi MARA, Selangor, MALAYSIA
Volume
4
fYear
2008
fDate
26-28 Aug. 2008
Firstpage
1
Lastpage
8
Abstract
Risk management in IT outsourcing projects is a process of identifying, analyzing, controlling and reducing risks in IT outsourcing projects life cycle. Risk management is important as the practices of risk management will reduce the risks thus lead to success in IT outsourcing projects. Risk management should be conducted in IT outsourcing as it will foresee risks that might disturb the smooth flowing of IT outsourcing and prevent or reduce the impact of risks if they occur. Therefore, the primary objective of this paper is to analyze how organizations conducted risk management in IT outsourcing practices. The findings revealed that organizations highly considered the last phase of risk management in IT outsourcing which is on-going monitoring. The organizations least considered the first phase; analysis of decision to outsource whereas this phase is very important as a preparation to enter IT outsourcing activities. Therefore, even though other phases were highly considered, lack of initial preparation will reduce the probability of success in IT outsourcing. For future works, the weaknesses and vulnerability of current practices will then be enhanced and framework of risk management in IT outsourcing will then be developed.
Keywords
Disaster management; Environmental management; Information analysis; Information technology; Management training; Monitoring; Outsourcing; Risk analysis; Risk management; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Technology, 2008. ITSim 2008. International Symposium on
Conference_Location
Kuala Lumpur, Malaysia
Print_ISBN
978-1-4244-2327-9
Electronic_ISBN
978-1-4244-2328-6
Type
conf
DOI
10.1109/ITSIM.2008.4631922
Filename
4631922
Link To Document