• DocumentCode
    2926071
  • Title

    Controlling Remanufacturing Time Based on Markov Process

  • Author

    Xiaoyan, Yang ; Fenglian, Gao

  • Author_Institution
    Sch. of Econ. & Manage., Taiyuan Univ. of Technol., Taiyuan, China
  • Volume
    1
  • fYear
    2009
  • fDate
    26-27 Dec. 2009
  • Firstpage
    176
  • Lastpage
    178
  • Abstract
    For the research of remanufacturing, scholars focus more on the problems such as the optimization of the procedure order and the formulation of production schedule while less work has been done on the control of the operation time during each process of waste remanufacturing. This text makes quantitative control on the time shifting of the waste in remanufacturing procedure under random environment, divides the treatment state of waste in the remanufacturing course into the transient state and absorbing state. The waste transits in the course of remanufacturing have been got. I make use of Markov process to get several time indexes, which have offered one mathematics tool for accelerating the value appreciation course of the waste.
  • Keywords
    Markov processes; production control; recycling; scheduling; Markov process; production schedule; quantitative control; remanufacturing time; waste remanufacturing; Costs; Environmental economics; Innovation management; Job shop scheduling; Markov processes; Optimized production technology; Reverse logistics; Technology management; Uncertainty; Waste management; Markov process; random environment; remanufacturing; reverse logistics; waste;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering, 2009 International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-0-7695-3876-1
  • Type

    conf

  • DOI
    10.1109/ICIII.2009.49
  • Filename
    5369927