DocumentCode
2926710
Title
Notice of Retraction
Evaluation for Investment Cost Influence Factors of Expressway Project
Author
Shi Xi´an ; Yang Meng-rou
Author_Institution
Sch. of Highway, Chang´an Univ., Xi´an, China
fYear
2011
fDate
25-28 March 2011
Firstpage
1
Lastpage
5
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
The comprehensive index system for expressway project was set up in order to study the investment expense of expressway project under the influence of multi-factors from economic, technical and policy aspects. Grey relational analysis method was utilized to quantitatively analyze the factors that affect highway construction expense, which could determine the key factors of controlling different terrain highway construction expense. The paper took the built expressway´s final expense of S province for examples and applied the proposed method to determine the correlation coefficient of the individual project on S1, S2 and S3 regions of S province. Example results show that the evaluation index system and evaluation method could determine reasonably new projects investment expense and ultimately achieve the purpose of effectively control it.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
The comprehensive index system for expressway project was set up in order to study the investment expense of expressway project under the influence of multi-factors from economic, technical and policy aspects. Grey relational analysis method was utilized to quantitatively analyze the factors that affect highway construction expense, which could determine the key factors of controlling different terrain highway construction expense. The paper took the built expressway´s final expense of S province for examples and applied the proposed method to determine the correlation coefficient of the individual project on S1, S2 and S3 regions of S province. Example results show that the evaluation index system and evaluation method could determine reasonably new projects investment expense and ultimately achieve the purpose of effectively control it.
Keywords
construction industry; costing; grey systems; investment; project management; road building; built expressway final expense; evaluation index system; grey relational analysis; highway construction expense; investment cost influence factor; Bridges; Economics; Indexes; Investments; Roads; Tunneling;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
Conference_Location
Wuhan
ISSN
2157-4839
Print_ISBN
978-1-4244-6253-7
Type
conf
DOI
10.1109/APPEEC.2011.5748374
Filename
5748374
Link To Document