• DocumentCode
    2928167
  • Title

    The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm

  • Author

    Moore, Mike

  • Author_Institution
    Shermco Ind., Irving, TX, USA
  • fYear
    2011
  • fDate
    5-8 June 2011
  • Firstpage
    423
  • Lastpage
    429
  • Abstract
    As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.
  • Keywords
    power cable testing; wind power plants; wind turbines; USA; service aged medium voltage power cables testing methodologies; wind farm; wind generation sites; wind turbines; Aging; Cable insulation; Maintenance engineering; Medium voltage; Power cables; Testing; cable testing; fault analysis; field testing; reliability testing; wind farms;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Insulation Conference (EIC), 2011
  • Conference_Location
    Annapolis, MD
  • ISSN
    pending
  • Print_ISBN
    978-1-4577-0278-5
  • Electronic_ISBN
    pending
  • Type

    conf

  • DOI
    10.1109/EIC.2011.5996191
  • Filename
    5996191