DocumentCode :
2928167
Title :
The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm
Author :
Moore, Mike
Author_Institution :
Shermco Ind., Irving, TX, USA
fYear :
2011
fDate :
5-8 June 2011
Firstpage :
423
Lastpage :
429
Abstract :
As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.
Keywords :
power cable testing; wind power plants; wind turbines; USA; service aged medium voltage power cables testing methodologies; wind farm; wind generation sites; wind turbines; Aging; Cable insulation; Maintenance engineering; Medium voltage; Power cables; Testing; cable testing; fault analysis; field testing; reliability testing; wind farms;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Insulation Conference (EIC), 2011
Conference_Location :
Annapolis, MD
ISSN :
pending
Print_ISBN :
978-1-4577-0278-5
Electronic_ISBN :
pending
Type :
conf
DOI :
10.1109/EIC.2011.5996191
Filename :
5996191
Link To Document :
بازگشت