The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm
Author
Moore, Mike
Author_Institution
Shermco Ind., Irving, TX, USA
fYear
2011
fDate
5-8 June 2011
Firstpage
423
Lastpage
429
Abstract
As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.
Keywords
power cable testing; wind power plants; wind turbines; USA; service aged medium voltage power cables testing methodologies; wind farm; wind generation sites; wind turbines; Aging; Cable insulation; Maintenance engineering; Medium voltage; Power cables; Testing; cable testing; fault analysis; field testing; reliability testing; wind farms;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Insulation Conference (EIC), 2011
Conference_Location
Annapolis, MD
ISSN
pending
Print_ISBN
978-1-4577-0278-5
Electronic_ISBN
pending
Type
conf
DOI
10.1109/EIC.2011.5996191
Filename
5996191
Link To Document