• DocumentCode
    2928724
  • Title

    Before Dynamic Simulation: Systematic Layout Design from Scratch

  • Author

    Sly, David P.

  • Author_Institution
    Iowa State University
  • fYear
    1997
  • fDate
    7-10 Dec. 1997
  • Firstpage
    645
  • Lastpage
    648
  • Keywords
    Electronic switching systems; Manufacturing processes; Manufacturing systems; Optimized production technology; Pareto analysis; Production facilities; Production planning; Routing; Software tools; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 1997., Proceedings of the 1997 Winter
  • Conference_Location
    Atlanta, Georgia, USA
  • Print_ISBN
    0-7803-4278-X
  • Type

    conf

  • DOI
    10.1109/WSC.1997.640932
  • Filename
    640932