DocumentCode :
2932141
Title :
Optimal size selection for step-up transformers for wind generation plants
Author :
De Caro, S. ; Scimone, T. ; Testa, A. ; Yasin, A.
Author_Institution :
DCIIM, Univ. of Messina, Messina, Italy
fYear :
2012
fDate :
20-22 June 2012
Firstpage :
571
Lastpage :
576
Abstract :
This paper presents a general design methodology to optimally select the ratings of step-up transformers for grid connected Wind Turbine Generators on the basis of the statistical distribution of the wind energy and the mathematical model of the plant. The methodology exploits a probabilistic approach based on the evaluation of the so called LPPP (Loss of Produced Power Probability) index. The Internal Rate of Return (IRR) and the Discount Payback Period (PBP) can be computed from the results of the LPPP analysis and exploited to detect the most advantageous solution.
Keywords :
AC generators; mathematical analysis; power transformers; probability; wind power plants; wind turbines; DBP; IRR; LPPP index; discount payback period; grid connected wind turbine generators; internal rate of return; loss of produced power probability index; mathematical model; optimal size selection; step-up transformers; wind generation plants; Energy storage; Generators; Indexes; System-on-a-chip; Wind farms; Wind speed; Wind turbines; Energy Storage; Power Generation; Transformers; Wind Turbine Generators;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Electronics, Electrical Drives, Automation and Motion (SPEEDAM), 2012 International Symposium on
Conference_Location :
Sorrento
Print_ISBN :
978-1-4673-1299-8
Type :
conf
DOI :
10.1109/SPEEDAM.2012.6264605
Filename :
6264605
Link To Document :
بازگشت