DocumentCode
293447
Title
Schedule optimization using fuzzy inference
Author
Soma, Hiroshi ; Hori, Masaki ; Sogou, Taiji
Author_Institution
Div. of Fuzzy Technol. & Bus. Promotion, Omron Corp., Kyoto, Japan
Volume
3
fYear
1995
fDate
20-24 Mar 1995
Firstpage
1171
Abstract
Many search algorithms have been developed to solve combinatorial optimization problems. The simulation method is often used to make practical job shop schedules, because search algorithms take long processing time. This paper proposes a fast algorithm to improve the schedule. This algorithm is based on general heuristic which reforms the Gantt chart. It is very useful for improving the schedules which are made by a simulation method. Including both logical and numerical judgment, the heuristic is implemented by fuzzy rules and membership functions
Keywords
fuzzy set theory; inference mechanisms; optimisation; production control; scheduling; Gantt chart; fuzzy inference; fuzzy rules; general heuristic; job shop scheduling; membership functions; search algorithms; Electronic mail; Fuzzy logic; Job shop scheduling; Operations research; Optimal scheduling; Optimization methods; Production; Routing; Scheduling algorithm; Search methods;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems, 1995. International Joint Conference of the Fourth IEEE International Conference on Fuzzy Systems and The Second International Fuzzy Engineering Symposium., Proceedings of 1995 IEEE Int
Conference_Location
Yokohama
Print_ISBN
0-7803-2461-7
Type
conf
DOI
10.1109/FUZZY.1995.409831
Filename
409831
Link To Document