• DocumentCode
    2936535
  • Title

    Accelerated engineering: the 3 secrets to just-in-time product development (JITPD)

  • Author

    Kopelman, Orion

  • Author_Institution
    Global Brain Inc., Pala Alto, CA, USA
  • fYear
    1994
  • fDate
    27-29 Sep 1994
  • Firstpage
    362
  • Lastpage
    367
  • Abstract
    The financial health of a company can increasingly depend on executing "Just In Time (JlT) Product Development," or JITPD. Lagging the market by taking too long to develop and release a product can prove disastrous, while proper execution of JITPD results in tremendous rewards. This paper gives some insight into how to accelerate engineering development times by up to 50 percent, by practicing the three secrets to Quality RAPID Product Development (QRPD)
  • Keywords
    product development; production control; JITPD; accelerated engineering; engineering development times; just-in-time product development; product release; quality rapid product development; Acceleration; Assembly; Companies; Costs; Design engineering; Industrial economics; Printers; Product development; Research and development; Time to market;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    WESCON/94. Idea/Microelectronics. Conference Record
  • Conference_Location
    Anaheim , CA
  • ISSN
    1095-791X
  • Print_ISBN
    0-7803-9992-7
  • Type

    conf

  • DOI
    10.1109/WESCON.1994.403571
  • Filename
    403571