DocumentCode :
2936535
Title :
Accelerated engineering: the 3 secrets to just-in-time product development (JITPD)
Author :
Kopelman, Orion
Author_Institution :
Global Brain Inc., Pala Alto, CA, USA
fYear :
1994
fDate :
27-29 Sep 1994
Firstpage :
362
Lastpage :
367
Abstract :
The financial health of a company can increasingly depend on executing "Just In Time (JlT) Product Development," or JITPD. Lagging the market by taking too long to develop and release a product can prove disastrous, while proper execution of JITPD results in tremendous rewards. This paper gives some insight into how to accelerate engineering development times by up to 50 percent, by practicing the three secrets to Quality RAPID Product Development (QRPD)
Keywords :
product development; production control; JITPD; accelerated engineering; engineering development times; just-in-time product development; product release; quality rapid product development; Acceleration; Assembly; Companies; Costs; Design engineering; Industrial economics; Printers; Product development; Research and development; Time to market;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
WESCON/94. Idea/Microelectronics. Conference Record
Conference_Location :
Anaheim , CA
ISSN :
1095-791X
Print_ISBN :
0-7803-9992-7
Type :
conf
DOI :
10.1109/WESCON.1994.403571
Filename :
403571
Link To Document :
بازگشت