• DocumentCode
    2938583
  • Title

    Economics Analysis of Retrofit of Flow Passage of a 300MW Steam Turbine

  • Author

    Shi Yang ; Li Wan-Fan ; Xie Dan-mei ; Tan Cheng-cheng ; Feng Ming ; Cai Sun

  • Author_Institution
    Sch. of Power & Mech. Eng., Wuhan Univ., Wuhan, China
  • fYear
    2011
  • fDate
    25-28 March 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The retrofit of flow passage of a steam turbine is a feasible measure of save energy and capacity enlargement of a unit and the ROI (return on investment) is high. The economics of retrofitted units is related to many factors. This paper analyzes the economic indicators of a 300WM steam turbine flow passage retrofit, as payback period, FNPV (Financial Net Present Value) and FIRR (financial Internal Rate of Return) etc., based on the data of unit´s test and actual operation condition.
  • Keywords
    maintenance engineering; power generation economics; steam turbines; capacity enlargement; economics analysis; financial internal rate of return; financial net present value; flow passage; power 300 MW; retrofit; return on investment; steam turbine; Blades; Boilers; Coal; Economics; Generators; Turbines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
  • Conference_Location
    Wuhan
  • ISSN
    2157-4839
  • Print_ISBN
    978-1-4244-6253-7
  • Type

    conf

  • DOI
    10.1109/APPEEC.2011.5748972
  • Filename
    5748972