Managing congestion at the seams of PJM & MISO
Author :
Bowe, T. ; Rodriguez, A.
fYear :
2004
fDate :
10-10 June 2004
Firstpage :
113
Abstract :
Summary form only given. As PJM and MISO implement their electricity markets, a number of issues have arisen regarding the coordination of operations at the seams or boundaries between these systems. One of the major issues is the interaction of the different congestion management methodologies (market based and traditional) used by the parties. This presentation describes the methods included the joint operating agreement (JOA) between MISO and PJM, of December 15, 2003 to ensure that parallel flows and impacts are recognized and controlled to maintain system reliability
Keywords :
power markets; power system interconnection; MISO market; PJM market; congestion management methodologies; electricity markets; joint operating agreement; system reliability; Consumer electronics; Control systems; Electricity supply industry; Energy management; Load flow analysis; Maintenance; Reliability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.4632902
Filename :
4632902
Link To Document :
بازگشت