DocumentCode :
2943222
Title :
Integrated resources planning at CEB-Brasilia city utility
Author :
Figueiredo, F.M. ; Jardini, J.A.
Author_Institution :
Companhia Energetica de Brasilia, Brazil
Volume :
6
fYear :
1997
fDate :
1997
Firstpage :
42491
Abstract :
Due to the fact that CEB electric utility (Brazil) depends almost totally on external generation, buying 95% of the energy that it distributes, the development of studies that compare the supply options with load management alternatives is of large interest. This dependency makes the utility vulnerable to the institutional changes in the Brazilian electric sector and even concerning the oscillation of possible supply tariff (buying) and distribution (selling). This paper contains the description of the methodology used for the comparative studies among the supply options and the demand side management programs
Keywords :
electricity supply industry; Brazil; CEB; demand side management; electric utility; electricity tariffs; external generation; integrated resources planning; load management; power distribution; power supply options;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location :
Birmingham
ISSN :
0537-9989
Print_ISBN :
0-85296-674-1
Type :
conf
DOI :
10.1049/cp:19970619
Filename :
671561
Link To Document :
بازگشت