• DocumentCode
    2944607
  • Title

    Strategic system planning of an urban power system for 60000 inhabitants

  • Author

    Aichinger, A. ; Conner, Timothy

  • Author_Institution
    Siemens AG, Germany
  • Volume
    6
  • fYear
    1997
  • fDate
    1997
  • Abstract
    Planning experience is documented with the practical example of the town of Singen (Germany), located to the west of Lake Constance, supplied by the Gasand Elektrizitaetswerk Singen (GEWS). Since the turn of the century, the town of Singen has had a public power supply system for what was then 2500 inhabitants. After an eventful history of remarkable urban development and industrialization, 1996 sees the power supply system celebrating the centenary of its existence. Pending system improvement measures, such as cable and switchgear requirements, the differing system operating voltages of 20 and 16 kV, different suppliers with differing HV levels of 110 and 50 kV, decisions concerning new electricity supply agreements to be concluded and preparation for increased system automation were the reasons for commissioning this system upgrade study
  • Keywords
    power system planning; 110 kV; 16 kV; 20 kV; 50 kV; Germany; electricity supply agreements; operating experiences; power system improvement; public power supply system; strategic system planning; upgrade study; urban power system;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
  • Conference_Location
    Birmingham
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-674-1
  • Type

    conf

  • DOI
    10.1049/cp:19970644
  • Filename
    671586