Strategy for the renewal of 110 kV substations
Author
Niechziol, Ralf
Author_Institution
Hamburgische Electricitats-Werke AG, Germany
Volume
6
fYear
1997
fDate
1997
Abstract
Under the impression that there would be high load increases and the target levels of service reliability should be ensured, the German utility Hamburgische Electricitats-Werke AG (HEW) of the city-state of Hamburg constructed a large number of 110 kV substations between 1950 and 1970. Given the specific age structure of the substations and the current state of the electrical equipment in use, HEW has taken advantage of the planned renewal of a large 110 kV substation to develop a strategic approach to the timely evaluation of existing high-voltage plant which also allows long-term maintenance measures to be planned. Future refits will be largely influenced by revised considerations of the company´s philosophy on service reliability, by the inclusion of long-term load forecasts, and by an integrated rolling planning system for the entire 110 kV distribution network. In view of the expected changes and greater competition on the international electrical energy market, the remaining life time of system equipment must be exploited more strongly in order to reduce high investments for the necessary functional substance conservation of the high-voltage power system
Keywords
substations; 100 kV; Germany; electric utilities; integrated rolling planning system; long-term maintenance measures; power system maintenance; substation renewal strategy;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location
Birmingham
ISSN
0537-9989
Print_ISBN
0-85296-674-1
Type
conf
DOI
10.1049/cp:19970645
Filename
671587
Link To Document