Analysis of Multi-Resources Leveling Problem with Risk Float Time
Author
Guo, Haibin
Author_Institution
Coll. of Manage., Qingdao Technol. Univ., Qingdao, China
Volume
1
fYear
2011
fDate
28-29 March 2011
Firstpage
764
Lastpage
767
Abstract
A new multi-resources leveling model with risk float time is established in this paper. With presetting the new variable of risk float time at the end of activity float time, the model can realize the new function that the project risk can be considered at the same time the resource leveling process is calculated. The validity of the improved model in this paper is verified with the help of genetic algorithm.
Keywords
genetic algorithms; project management; resource allocation; risk management; genetic algorithm; multiresource leveling problem; project risk float time; Biological cells; Equations; Genetic algorithms; Genetics; Mathematical model; Modeling; Strontium; genetic algorithm; multi-resources leveling; network plan; risk float time;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Computation Technology and Automation (ICICTA), 2011 International Conference on
Conference_Location
Shenzhen, Guangdong
Print_ISBN
978-1-61284-289-9
Type
conf
DOI
10.1109/ICICTA.2011.198
Filename
5750732
Link To Document