Impact of Uncertainty and Risk Assessment in Multimedia Project Scheduling
Author :
Elmasry, R.S. ; ElSayed, Aziz E.
Author_Institution :
Dept. of Ind. & Manage. Eng., Arab Acad. for Sci. and Technol. & Maritime Transp., Alexandria
Volume :
2
fYear :
2006
fDate :
21-23 June 2006
Firstpage :
653
Lastpage :
657
Abstract :
Multimedia (MM) projects are characterized by high creativity and innovation levels which are greatly influenced by developers performance. This paper deals with multimedia projects scheduling, uncertainties and risks that would occur during the development phase. The goal is to establish a procedural model to tackle these issues. Such generalized model can be applied in most multimedia projects no matter what the size of the project being developed is
Keywords :
multimedia computing; risk management; scheduling; software development management; creativity; developers performance; innovation levels; multimedia project scheduling; risk assessment; uncertainty; Design engineering; Educational institutions; Electric breakdown; Job shop scheduling; Multimedia systems; Production; Project management; Prototypes; Risk management; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management of Innovation and Technology, 2006 IEEE International Conference on
Conference_Location :
Singapore, China
Print_ISBN :
1-4244-0147-X
Electronic_ISBN :
1-4244-0148-8
Type :
conf
DOI :
10.1109/ICMIT.2006.262300
Filename :
4037098
Link To Document :
بازگشت