• DocumentCode
    2961501
  • Title

    Sequencing production on an assembly line using goal chasing and user defined algorithm

  • Author

    Mane, Arvind ; Nahavandi, Saeid ; Zhang, Jingxin

  • Author_Institution
    Sch. of Eng. & Technol., Deakin Univ., Geelong, Vic., Australia
  • Volume
    2
  • fYear
    2002
  • fDate
    8-11 Dec. 2002
  • Firstpage
    1269
  • Abstract
    An Australian automotive component company plans to assemble and deliver seats to customer on a just-in-time basis. It plans to assemble various seat types on one assembly line. Mixed-model sequencing is very important if a company has to assemble seats in a just-in-time environment. Toyota Motor Company´s goal chasing algorithm I and a user defined algorithm are used to sequence seats on the assembly line. Discrete event simulation software is used to model the assembly operations of the seat plant. Both algorithms are programmed to generate a sequence for the seat plant. Model results show both algorithms can sequence seats on the assembly line and each algorithm has its advantages and disadvantages.
  • Keywords
    assembling; automobile industry; discrete event simulation; production control; Australia; Toyota Motor Company; assembly line; automotive component company; automotive seats; discrete event simulation software; goal chasing algorithm I; just-in-time basis; mixed-model sequencing; user defined algorithm; Air conditioning; Assembly systems; Australia; Automotive components; Automotive engineering; Discrete event simulation; Production; Steering systems; Virtual manufacturing; Workstations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2002. Proceedings of the Winter
  • Print_ISBN
    0-7803-7614-5
  • Type

    conf

  • DOI
    10.1109/WSC.2002.1166387
  • Filename
    1166387