DocumentCode :
2962755
Title :
Implementation: the real total quality challenge
Author :
Grunenwald, William J.
Author_Institution :
ADM Consultants Inc., Fairborn, OH, USA
fYear :
1989
fDate :
22-26 May 1989
Firstpage :
1471
Abstract :
Seven steps to total-quality implementation are listed and discussed. These are (1) establish a full time advocate, (2) develop a formal plan, (3) be consistent, (4) provide the resources, (5) select improvement areas carefully, (6) consider outside help, and (7) be patient
Keywords :
management; quality control; formal plan; total quality management; Business continuity; Companies; Costs; Fellows; Job design; Quality management; Resource management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Aerospace and Electronics Conference, 1989. NAECON 1989., Proceedings of the IEEE 1989 National
Conference_Location :
Dayton, OH
Type :
conf
DOI :
10.1109/NAECON.1989.40407
Filename :
40407
Link To Document :
بازگشت