Title :
The Applying of AHP Method in an Engineer Blast Project
Author :
Zhang Chuan Ming ; Wang Zu He
Author_Institution :
Shandong Provincial Key Lab. of Civil Eng., Shandong Univ. of Sci. & Technol., Qingdao, China
Abstract :
In engineering blasting practice, there are a lot of unsafe factors which have big uncertainty. Some of them can´t fully quantitative analysis. So it´s difficult to select a good blasting scheme selection. Using AHP method can solve the problems. This paper introduces the working principle of AHP method. And it discusses the specific application, combining a Qingdao blasting engineering case.
Keywords :
decision making; explosions; industrial accidents; occupational safety; AHP method; Qingdao blasting engineering; blasting scheme selection; engineer blast project; Accidents; Economics; Explosives; Indexes; Rocks; Uncertainty;
Conference_Titel :
Management and Service Science (MASS), 2011 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-6579-8
DOI :
10.1109/ICMSS.2011.5998175