DocumentCode
2964300
Title
Agency Costs of Engineering Project Procurement
Author
Shouke Chen ; Zhuobin Wei
Author_Institution
Dept. of Logistics Eng., Naval Univ. of Eng., Tianjin, China
fYear
2011
fDate
12-14 Aug. 2011
Firstpage
1
Lastpage
5
Abstract
Based on asymmetric information game and principal-agent theory, by analyzing the forming reasons and connotation relationships of agency costs which occurs during the process of engineering project procurement, this paper give out the model of optimal contract and monitoring mechanism. It also analyzes the relationships between the monitoring mechanism and incentive mechanism.
Keywords
contracts; game theory; procurement; project management; agency costs; asymmetric information game; engineering project procurement process; incentive mechanism; monitoring mechanism; optimal contract model; principal-agent theory; Contracts; Games; Hydroelectric power generation; Investments; Loss measurement; Monitoring; Procurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2011 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-6579-8
Type
conf
DOI
10.1109/ICMSS.2011.5998229
Filename
5998229
Link To Document