DocumentCode
2965866
Title
A multi-agent and extremal optimization system for “steelmaking -continuous casting - hot strip mill” integrated scheduling
Author
Ji, Rigeng ; Lu, Yong-Zai
Author_Institution
Inst. of Cyber Syst. & Control, Zhejiang Univ., Hangzhou, China
fYear
2009
fDate
8-11 Dec. 2009
Firstpage
2365
Lastpage
2369
Abstract
This paper presents recent results in applying a multi-agent system combined with extremal optimization to deal with integrated scheduling for "steelmaking, continuous cast and hot strip mill", a multistage, hybrid and real-world production system in steel industry. The main goal of this research aims to minimize the energy losses through the optimization, cooperation, coordination and communications between the multiple knowledge-based agents. The problem formulation, system architecture and optimization algorithms are described. The simulation results with production size data show the applicability of the proposed solutions.
Keywords
casting; multi-agent systems; optimisation; production control; scheduling; steel manufacture; strips; continuous casting; extremal optimization system; hot strip mill; integrated scheduling; multi-agent system; optimization algorithms; steelmaking; system architecture; Casting; Continuous production; Iron; Job shop scheduling; Milling machines; Multiagent systems; Production systems; Slabs; Steel; Strips; Extremal optimization; Integrated production scheduling; Multi-agent system; Steel production;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-4869-2
Electronic_ISBN
978-1-4244-4870-8
Type
conf
DOI
10.1109/IEEM.2009.5372998
Filename
5372998
Link To Document