• DocumentCode
    2965866
  • Title

    A multi-agent and extremal optimization system for “steelmaking -continuous casting - hot strip mill” integrated scheduling

  • Author

    Ji, Rigeng ; Lu, Yong-Zai

  • Author_Institution
    Inst. of Cyber Syst. & Control, Zhejiang Univ., Hangzhou, China
  • fYear
    2009
  • fDate
    8-11 Dec. 2009
  • Firstpage
    2365
  • Lastpage
    2369
  • Abstract
    This paper presents recent results in applying a multi-agent system combined with extremal optimization to deal with integrated scheduling for "steelmaking, continuous cast and hot strip mill", a multistage, hybrid and real-world production system in steel industry. The main goal of this research aims to minimize the energy losses through the optimization, cooperation, coordination and communications between the multiple knowledge-based agents. The problem formulation, system architecture and optimization algorithms are described. The simulation results with production size data show the applicability of the proposed solutions.
  • Keywords
    casting; multi-agent systems; optimisation; production control; scheduling; steel manufacture; strips; continuous casting; extremal optimization system; hot strip mill; integrated scheduling; multi-agent system; optimization algorithms; steelmaking; system architecture; Casting; Continuous production; Iron; Job shop scheduling; Milling machines; Multiagent systems; Production systems; Slabs; Steel; Strips; Extremal optimization; Integrated production scheduling; Multi-agent system; Steel production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-4869-2
  • Electronic_ISBN
    978-1-4244-4870-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2009.5372998
  • Filename
    5372998