• DocumentCode
    2967282
  • Title

    The Prediction of Mould Project Duration Based on Recursive Network

  • Author

    Changwei, Hu ; Xindu, Chen ; Qingxin, Chen

  • Author_Institution
    Fac. of Electromech. Eng., Guangdong Univ. of Technol., Guangzhou, China
  • Volume
    2
  • fYear
    2011
  • fDate
    28-29 March 2011
  • Firstpage
    1229
  • Lastpage
    1232
  • Abstract
    The critical path method (CPM) is often used to make the project plan and predict the project duration in mould manufacturing projects. For generating manageable networks, the CPM networks assume that networks are directed without loops. So in CPM, recursive works are ignored. But in actual mould manufacturing, reworking of tasks are frequent and inevitable, and then they will result in project delaying. So the planned project duration is often less then the actual one. The paper added the loops in the CPM network, and created the prediction model of the duration based on reworking using the Markov chains and solved the probabilities of the mould project duration.
  • Keywords
    Markov processes; critical path analysis; moulding; Markov chains; critical path method; mould manufacturing projects; mould project duration prediction; project plan; recursive network; Machining; Manufacturing; Markov processes; Predictive models; Probability; Schedules; Trajectory; Markov chains; duration prediction; mould manufacturing; rework;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Computation Technology and Automation (ICICTA), 2011 International Conference on
  • Conference_Location
    Shenzhen, Guangdong
  • Print_ISBN
    978-1-61284-289-9
  • Type

    conf

  • DOI
    10.1109/ICICTA.2011.607
  • Filename
    5751117