Title : 
Royalty analysis for BOT projects based on the negotiation viewpoint
         
        
            Author : 
Kang, Chao-Chung ; Feng, Cheng-Min ; Kuo, Chiu-Yen
         
        
            Author_Institution : 
Dept. of Bus. Adm., Providence Univ., Taichung Hsien, Taiwan
         
        
        
        
        
        
            Abstract : 
This study constructs three royalty negotiation models, including the lump-sum royalty, operational revenue-based royalty, and operational output-based royalty, using the bi-level programming approach. In addition, this paper also develops the iterative algorithm for bi-level programming problem for the government and the private sector. A number of factors were incorporated into this algorithm including concession rate, time value discount rate, learning rate and number of negotiations.
         
        
            Keywords : 
finance; iterative methods; programming; BOT projects; bi-level programming approach; build operate and transfer project; concession rate; iterative algorithm; lump-sum royalty; negotiation; operational output-based royalty; operational revenue-based royalty; Computational modeling; Contracts; Game theory; Government; Investments; Iterative algorithms; Mathematical model; Mathematical programming; Road transportation; Traffic control; BOT; bi-level programming; negotiation; royalty;
         
        
        
        
            Conference_Titel : 
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
         
        
            Conference_Location : 
Hong Kong
         
        
            Print_ISBN : 
978-1-4244-4869-2
         
        
            Electronic_ISBN : 
978-1-4244-4870-8
         
        
        
            DOI : 
10.1109/IEEM.2009.5373178