DocumentCode
296976
Title
An efficient procedure for solving a car sequencing problem
Author
Guerre-Chaley, F. ; Frein, Y. ; Bouffard-Vercelli, R.
Author_Institution
Lab. d´´Autom. de Grenoble, Saint Martin d´´Heres, France
Volume
2
fYear
1995
fDate
10-13 Oct 1995
Firstpage
385
Abstract
In order to prepare the supply of the assembly workshop, a pre-sequencing of cars is carried out before the soldering shop, representing a certain number of production days. Moreover, each car has a due date, which indicates the date the car must be on the assembly line. Out goal is to provide a very fast algorithm (real time constraint) to develop a computer-aided car sequencing system for the assembly shop. This algorithm must realize a trade-off between speed and efficiency. This paper first describes the car sequencing problem and how it can be made into a cost function. The problem of optimization is then detailed
Keywords
assembling; automobile industry; computer aided production planning; costing; optimisation; production control; automobile industry; car assembly; car sequencing; inventory cost; one step sequencing; optimization; production control; Air conditioning; Assembly; Buildings; Conferences; Diesel engines; Job shop scheduling; Manufacturing industries; Paints; Production systems; Soldering;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technologies and Factory Automation, 1995. ETFA '95, Proceedings., 1995 INRIA/IEEE Symposium on
Conference_Location
Paris
Print_ISBN
0-7803-2535-4
Type
conf
DOI
10.1109/ETFA.1995.496679
Filename
496679
Link To Document