• DocumentCode
    2970121
  • Title

    Dynamic scheduling of multi-task for hybrid flow-shop based on energy consumption

  • Author

    Ling-li, Zeng ; Feng-xing, Zou ; Xiao-hong, Xu ; Zheng, Gao

  • Author_Institution
    Dept. of Autom. Control, Nat. Univ. of Defense Technol., Changsha, China
  • fYear
    2009
  • fDate
    22-24 June 2009
  • Firstpage
    478
  • Lastpage
    482
  • Abstract
    This paper presents an approach to solve dynamic scheduling of multi-task for hybrid flow-shop with the objective of minimizing the energy consumption. The idea of idle time window (ITW) is introduced, then the dynamic updating rules of the sets of ITWs are explained in detail. With the sets of ITWs of machines as constraints, the mathematical model is proposed for dynamic scheduling of multi-task for hybrid flowshop with the objective of minimizing the energy consumption. The particle swarm optimization algorithm is employed to solve this problem. The results of simulation indicate that this approach satisfies the demand of dynamic scheduling of multitask with the objective of minimizing the energy consumption.
  • Keywords
    energy consumption; flow shop scheduling; particle swarm optimisation; dynamic multitask scheduling; dynamic updating rules; energy consumption; hybrid flow-shop; idle time window; particle swarm optimization algorithm; Automation; Dynamic scheduling; Electric breakdown; Energy consumption; Environmental economics; Genetic algorithms; Mathematical model; Multiagent systems; Particle swarm optimization; Power generation economics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information and Automation, 2009. ICIA '09. International Conference on
  • Conference_Location
    Zhuhai, Macau
  • Print_ISBN
    978-1-4244-3607-1
  • Electronic_ISBN
    978-1-4244-3608-8
  • Type

    conf

  • DOI
    10.1109/ICINFA.2009.5204971
  • Filename
    5204971