Title :
Development of ATACS and first-phase control run tests (Advanced Train Administration and Communications System)
Author :
Kobayashi, Teruo ; Iba, Osamu ; Ebine, K.O. ; Aoyagi, Shigeharu
Author_Institution :
Safety Res. Lab., East Japan Railway Co., Tokyo, Japan
Abstract :
A conventional train control system uses the information of train location detected by wayside signaling facilities. The system requires, however, enormous number of wayside facilities, which causes the huge cost of maintenance and installation. Applying information and communication technologies, we have developed the Advanced Train Administration and Communications System (ATACS), a new train control system in which each train detects its location by itself, and the main wayside equipment controls the train interval through digital radio communication. We started developing ATACS in 1995 and conducted the first-phase test at Senseki line, a local line in a northern part of Japan, from September 1997 to March 1998. At the test, we confirmed three basic functions of the system, train-location-detection, train-interval control, and transmission of control data by digital radio
Keywords :
data communication; digital radio; land mobile radio; rail traffic; railways; signalling; traffic control; ATACS; Advanced Train Administration and Communications System; Japan; control data transmission; digital radio communication; first-phase control run tests; installation; maintenance; train control system; train location; train-interval control; train-location-detection; wayside signaling facilities; Base stations; Communication system control; Control systems; Costs; Digital communication; Digital control; Radio control; Rail transportation; Railway safety; System testing;
Conference_Titel :
Vehicular Technology Conference, 1999 IEEE 49th
Conference_Location :
Houston, TX
Print_ISBN :
0-7803-5565-2
DOI :
10.1109/VETEC.1999.778472