DocumentCode :
2972737
Title :
Solving a dock assignment problem as a three-stage flexible flow-shop problem
Author :
Berghman, L. ; Leus, R.
Author_Institution :
ORSTAT, K.U. Leuven, Leuven, Belgium
fYear :
2009
fDate :
8-11 Dec. 2009
Firstpage :
320
Lastpage :
324
Abstract :
This paper presents a model for a dock assignment problem based on the situation encountered in a practical case. Trailers are assigned to gates during a specific period in time for loading or unloading activities. The parking lot is used as a buffer zone. Transportation between the parking lot and the gates is performed by additional resources called terminal tractors. The problem is modeled as a three-stage flexible flow shop, where the first and the third stage share the same identical parallel machines and besides that, all stages share a different set of identical parallel machines. Different mathematical formulations are given and a Lagrangian relaxation approach is examined to solve this flexible flow-shop problem.
Keywords :
automobile manufacture; flow shop scheduling; transportation; Lagrangian relaxation approach; buffer zone; dock assignment problem; identical parallel machines; terminal tractors; three stage flexible flow shop problem; Automobile manufacture; Buffer storage; Continents; Europe; Job shop scheduling; Lagrangian functions; Parallel machines; Safety; Transportation; Lagrangian relaxation; additional resources; dock assignment; flexible flow shop;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4244-4869-2
Electronic_ISBN :
978-1-4244-4870-8
Type :
conf
DOI :
10.1109/IEEM.2009.5373348
Filename :
5373348
Link To Document :
بازگشت