DocumentCode
2978250
Title
Risk analysis for distribution company energy procurement with pool market, DGs and demand response
Author
Shishebori, A. ; Kian, A. Rahimi
Author_Institution
Sch. of Electr. & Comput. Eng., Univ. of Tehran, Tehran, Iran
fYear
2010
fDate
11-13 May 2010
Firstpage
949
Lastpage
954
Abstract
In this paper, the energy procurement for a distribution company (Disco) from the pool market, distributed generations (DGs) and contractual interruptible loads with a risk constraint stochastic programming framework is presented. We propose a formulation that considers uncertainty of some parameters such as pool price, end user demand and the items which are related to DGs so that maximize the expected profit of Disco. Also the revenue of not producing emission gas by utilizing clean energy is considered. A realistic case study illustrates the methodology proposed.
Keywords
Contracts; Distributed computing; Electricity supply industry; History; Load management; Procurement; Risk analysis; Risk management; Stochastic processes; Uncertainty; CVaR; Contractual interruptible load; DG; pool market and uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Engineering (ICEE), 2010 18th Iranian Conference on
Conference_Location
Isfahan, Iran
Print_ISBN
978-1-4244-6760-0
Type
conf
DOI
10.1109/IRANIANCEE.2010.5506940
Filename
5506940
Link To Document