• DocumentCode
    2981977
  • Title

    Method of dynamically determining cycle time of a working stage

  • Author

    Wang, Tza-Huei ; Lin, Kuo-Cheng ; Huang, Seng-Rong

  • Author_Institution
    Fab2A Manuf. Dept., Taiwan Semicond. Manuf. Co. Ltd., Hsin-Chu, Taiwan
  • fYear
    1997
  • fDate
    13-15 Oct 1997
  • Firstpage
    403
  • Lastpage
    407
  • Abstract
    This paper presents a method of predicting production cycle time of a working stage in semiconductor manufacturing. For Scheduling, cycle time of a stage is usually applied to estimate the cycle time of the entire production line or the remaining production time. It is also often applied to generate the reasonable inventory level that should be queued in front of a stage. Since cycle time is highly affected by equipment loading density, a model is first created by combining Little´s formula and Kingman´s equation in the queuing theory to relate loading density with it. Cycle time distribution of each stage over the past time is characterized as a parameter set, based on the cycle time model and using a plurality of prior associated data. The equipment loading density of a stage in the next production run is calculated by considering the demanded quantity, mix and process flows of products. The stage cycle time of the next production run is then predicted by applying the equipment loading density to the cycle time model. The optimum amount of inventory kept in front of a stage to prevent equipment staving or WIP (work in process) piling up is also determined by using the data of cycle time and production target of a stage. The cycle time and the optimum inventory level (which is called standard WIP) of a stage are dynamically tuned as the customers´ demands vary. With this, cycle time and standard WIP could be more precisely defined and the delivery would be well controlled
  • Keywords
    production control; queueing theory; semiconductor device manufacture; stock control; Kingman equation; Little formula; equipment loading density; inventory level; production cycle time; queuing theory; scheduling; semiconductor manufacturing; standard work in process; working stage; Dispatching; Equations; Foundries; Job shop scheduling; Load modeling; Manufacturing industries; Production; Pulp manufacturing; Queueing analysis; Semiconductor device manufacture;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electronics Manufacturing Technology Symposium, 1997., Twenty-First IEEE/CPMT International
  • Conference_Location
    Austin, TX
  • ISSN
    1089-8190
  • Print_ISBN
    0-7803-3929-0
  • Type

    conf

  • DOI
    10.1109/IEMT.1997.626952
  • Filename
    626952