DocumentCode :
2982299
Title :
Study on Scheduling of Steelmaking Continuous Casting and Mould Casting
Author :
Liu, Wei ; Yu, Shengping ; Pang, Xinfu ; Zheng, Binglin ; Chai, Tianyou
Author_Institution :
Lab. of Integrated Autom. for the Process Ind., Northeastern Univ., Shenyang, China
fYear :
2010
fDate :
25-27 June 2010
Firstpage :
2120
Lastpage :
2123
Abstract :
The steelmaking continuous casting and mould casting is a procedure which is in high temperature, high commanding for real time, with significant time effect and complexity for schedule. For mould casting cannot be replaced by continuous casting in some area, the study in mould casting schedule has significant engineering value. To the actual situation, this paper aims at cracking the hard nut to make scheduling in workshop of steel-making plant.
Keywords :
casting; moulding; production control; scheduling; steel manufacture; mould casting schedule; scheduling; steel-making continuous casting; steel-making plant; Casting; Chemical engineering; Computers; Job shop scheduling; Optimal scheduling; Processor scheduling; Schedules; Continuous casting; mould casting; schedule policy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical and Control Engineering (ICECE), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-6880-5
Type :
conf
DOI :
10.1109/iCECE.2010.522
Filename :
5630002
Link To Document :
بازگشت