• DocumentCode
    2985415
  • Title

    A Fuzzy Logic Approach for Scheduling Preventive Maintenance in ERP System

  • Author

    Fouad, Rami Hikmat ; Samhouri, Murad

  • Author_Institution
    Ind. Eng. Dept., Hashemite Univ., Zarqa, Jordan
  • fYear
    2011
  • fDate
    12-14 Aug. 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Many firms have proceeded to the adoption of Enterprise Resources Planning ERP solutions to maintain competitiveness. ERP is a packaged software system that enables enterprises to integrate operations, business processes and functions through common database. However, the majority of ERP systems do not support Preventive Maintenance (PM) scheduling process. The objective of PM is to minimize equipment downtime using the limited resources of an organization. Therefore, prioritizing PM activities for equipment is essential. In this paper, a fuzzy logic-based system for PM scheduling is proposed to interpret the linguistic variables extracted from expert´s knowledge for determining equipment priorities, which could be incorporated as a custom module in ERP systems. The system was tested and proved to be reliable in solving PM scheduling problem.
  • Keywords
    enterprise resource planning; fuzzy logic; fuzzy reasoning; preventive maintenance; scheduling; software packages; ERP system; PM scheduling problem; database; enterprise resources planning; equipment downtime minimization; fuzzy inference system; fuzzy logic approach; packaged software system; preventive maintenance scheduling; Availability; Fuzzy logic; Job shop scheduling; Preventive maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2011 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-6579-8
  • Type

    conf

  • DOI
    10.1109/ICMSS.2011.5999330
  • Filename
    5999330