• DocumentCode
    2985924
  • Title

    The 2×2 requirement chart for ConOps development to optimize both cost of study and operation periods

  • Author

    Shiamzu, Keiko ; Ohkami, Yoshihisa

  • Author_Institution
    Keio Adv. Res. Center, Keio Univ., Yokohama, Japan
  • fYear
    2011
  • fDate
    17-20 March 2011
  • Firstpage
    345
  • Lastpage
    350
  • Abstract
    We propose a 2×2 requirement chart enabling effective identification of items in ConOps, a standard provided by IEEE, and establish a methodology how to use it. The main focus of our proposal is to obtain requirements necessary for constructing ConOps without any bias from realization methods and adopted techniques. By properly constructing ConOps through our chart, we are able to focus on the study period in systems engineering, and as a result to reduce the costs in operation period. We developed two identical enterprise systems, each using a different method, and compared the cost in the operation period of each result. The first method, without creating ConOps in the study period, goes through systems architecture development and systems design based on initial requirements provided by the customers, then moves on to implementation period (case 1). The other method creates ConOps using our 2×2 requirement chart, then processes the rest in the same way as case 1 (case 2). Through this experiment, we verified the effectiveness of the proposed requirement chart.
  • Keywords
    costing; ConOps development; architecture development; cost optimization; enterprise system; system design; system engineering; Indexes; Java; Maintenance engineering; System analysis and design;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Southeastcon, 2011 Proceedings of IEEE
  • Conference_Location
    Nashville, TN
  • ISSN
    1091-0050
  • Print_ISBN
    978-1-61284-739-9
  • Type

    conf

  • DOI
    10.1109/SECON.2011.5752963
  • Filename
    5752963