DocumentCode
2985924
Title
The 2×2 requirement chart for ConOps development to optimize both cost of study and operation periods
Author
Shiamzu, Keiko ; Ohkami, Yoshihisa
Author_Institution
Keio Adv. Res. Center, Keio Univ., Yokohama, Japan
fYear
2011
fDate
17-20 March 2011
Firstpage
345
Lastpage
350
Abstract
We propose a 2×2 requirement chart enabling effective identification of items in ConOps, a standard provided by IEEE, and establish a methodology how to use it. The main focus of our proposal is to obtain requirements necessary for constructing ConOps without any bias from realization methods and adopted techniques. By properly constructing ConOps through our chart, we are able to focus on the study period in systems engineering, and as a result to reduce the costs in operation period. We developed two identical enterprise systems, each using a different method, and compared the cost in the operation period of each result. The first method, without creating ConOps in the study period, goes through systems architecture development and systems design based on initial requirements provided by the customers, then moves on to implementation period (case 1). The other method creates ConOps using our 2×2 requirement chart, then processes the rest in the same way as case 1 (case 2). Through this experiment, we verified the effectiveness of the proposed requirement chart.
Keywords
costing; ConOps development; architecture development; cost optimization; enterprise system; system design; system engineering; Indexes; Java; Maintenance engineering; System analysis and design;
fLanguage
English
Publisher
ieee
Conference_Titel
Southeastcon, 2011 Proceedings of IEEE
Conference_Location
Nashville, TN
ISSN
1091-0050
Print_ISBN
978-1-61284-739-9
Type
conf
DOI
10.1109/SECON.2011.5752963
Filename
5752963
Link To Document