Title :
Implementation of regulation as an ancillary service in Eskom and the use of Eskom internal web for this service
Author :
Chown, G.A. ; Coetzee, M.G.
Author_Institution :
Eskom, Johannesburg, South Africa
Abstract :
This paper describes the implementation of regulation as a competitive ancillary service in Eskom. Eskom is presently forming a grid operator business, which is responsible for buying ancillary services and providing a reliable transmission network. The process of defining system performance criteria is described. The total costing of the regulation service to a single coal-fired generator was done using EPRI cost calculations. The performance of an individual generator is calculated along the guidelines of NERC Policy 10, with no allowance for over-control. This performance criterion determines regulation performance and payment to the generator. Over 750 points an downloaded every 4 seconds from the energy management system. System performance and individual unit performance are calculated using standard packages. This information is then made available in near-real time on the Eskom internal web in graphic and tabular form. This allows each generator to continually see its actual performance
Keywords :
electricity supply industry; energy management systems; frequency control; power generation control; EPRI cost calculations; Eskom; South Africa; competitive ancillary service; electric utility; energy management system; grid operator business; internal web; performance criterion; reliable transmission network; Africa; Automatic control; Automatic generation control; Control systems; Costs; Energy management; Power generation; Spinning; System performance; Thermal factors;
Conference_Titel :
Power Industry Computer Applications, 1999. PICA '99. Proceedings of the 21st 1999 IEEE International Conference
Conference_Location :
Santa Clara, CA
Print_ISBN :
0-7803-5478-8
DOI :
10.1109/PICA.1999.779409