• DocumentCode
    2988100
  • Title

    Positioning the Materials in Construction Project

  • Author

    Nie Wen-hui

  • Author_Institution
    Sch. of Comput. Sci. & Telecommun. Eng., Jiangsu Univ., Zhenjiang, China
  • fYear
    2009
  • fDate
    18-20 Jan. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In order to improve the monitoring and controlling performances in construction projects,especially in multi-story projects,this paper researched the approaches to track the materials and components on construction project.A locating model in 3 dimensional space is introduced.The mentioned locating algorithms are compared, shortages and advantages of each are given. The purpose is to find an optimal solution to manage the location information in construction project site with lower costs, higher locating accuracy and ideal reliability.
  • Keywords
    computerised monitoring; construction components; materials handling; position control; project management; construction project; location information; material management; materials positioning; multi-story projects; Automatic control; Building materials; Computerized monitoring; Global Positioning System; Neural networks; Project management; Radiofrequency identification; Ultrasonic imaging; Wireless communication; ZigBee;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Network and Multimedia Technology, 2009. CNMT 2009. International Symposium on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5272-9
  • Type

    conf

  • DOI
    10.1109/CNMT.2009.5374633
  • Filename
    5374633