DocumentCode
2990377
Title
Mobile Grid Task Scheduling Considering Resource Reliability
Author
Lei Liu ; Chunlin Li
Author_Institution
Dept. of Comput. Sci., Wuhan Univ. of Technol., Wuhan, China
fYear
2009
fDate
18-20 Jan. 2009
Firstpage
1
Lastpage
4
Abstract
The mobile grid supports mobile user and mobile resource with additional features such as limited energy, unstable network connection, etc. The mobile resource is composed of mobile device and the resource reliability is greatly decreased, which affects the grid scheduling. In this paper, the resource reliability is defined, which is evaluated from task completion time and energy consumption, in order to solve the problems caused by mobile devices in the scheduling. Moreover, the grid tasks are divided into two categories: urgent task and non-urgent task, which adopt different ways to calculate the resource reliability. Then, the revised min-min algorithm is proposed, which concerns with the resource reliability. It aims to select the most reliable resource to execute the grid tasks and ensure successful scheduling. The research simulations suggest that it can effectively shorten the task completion time, reduce the resource energy consumption and guarantee the load balancing.
Keywords
grid computing; mobile computing; reliability; resource allocation; scheduling; energy consumption; load balancing; mobile device; mobile grid task scheduling; mobile resource; mobile user; resource reliability; revised min-min algorithm; Algorithm design and analysis; Computer network reliability; Computer science; Energy consumption; Fault tolerance; Load management; Mobile computing; Processor scheduling; Quality of service; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Network and Multimedia Technology, 2009. CNMT 2009. International Symposium on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5272-9
Type
conf
DOI
10.1109/CNMT.2009.5374742
Filename
5374742
Link To Document