Risk Analysis of Construction Schedule Based on Monte Carlo Simulation
Author :
Wang Xing-xia ; Huang Jian-wen
Author_Institution :
Sch. of Water Resource & Hydropower, Wuhan Univ., Wuhan, China
fYear :
2009
fDate :
18-20 Jan. 2009
Firstpage :
1
Lastpage :
4
Abstract :
For a construction project, schedule is essential to the successful execution of the project, so the management of schedule is very critical. The most important risk about the construction schedule is duration risk. Duration risk means the possibility and loss of incompletion in the total stipulated duration limit. On the basis of the researches of other scholars, this paper simulates the project´s duration and analyzes the risk of construction schedule by Monte Carlo simulation (MCS) method. The process of Monte Carlo simulation for construction schedule risk analysis is established. At the same time it is applied in a numerical example. The result shows that the MCS method is very convenient, effective and efficient. It provides scientific quantitative basis and information for project management and helps decision makers easily make control with duration risk of project and make true decision.
Keywords :
Monte Carlo methods; construction industry; decision making; project management; risk analysis; scheduling; statistical distributions; Monte Carlo simulation method; construction schedule risk analysis; decision makers; duration risk analysis; project management; Analytical models; Design engineering; Monte Carlo methods; Project management; Reliability engineering; Resource management; Risk analysis; Risk management; Scheduling; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Network and Multimedia Technology, 2009. CNMT 2009. International Symposium on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5272-9
Type :
conf
DOI :
10.1109/CNMT.2009.5374816
Filename :
5374816
Link To Document :
بازگشت