DocumentCode
2996273
Title
Kife cycle cost procedure for commercial aircraft subsystems
Author
Dacko, Leszek M. ; Darlington, Ralph F.
Author_Institution
Dowty Canada Ltd., Ajax, Ont., Canada
fYear
1988
fDate
26-28 Jan 1988
Firstpage
389
Lastpage
394
Abstract
The authors identify the need to analyze the commercial aircraft subsystem cost effectiveness to optimize the design and production decisions of the subsystem manufacturer, The life cycle cost methodology developed by Dowty Canada Limited, together with the computer program that supports it, and an optimizing procedure, is presented
Keywords
aircraft instrumentation; design engineering; optimisation; Canada; aircraft instrumentation; commercial aircraft subsystems; computer program; design; life cycle cost; production; Aerospace control; Aircraft manufacture; Assembly; Cost function; Design optimization; Investments; Optimization methods; Production; Pulp manufacturing; Subcontracting;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability and Maintainability Symposium, 1988. Proceedings., Annual
Conference_Location
Los Angeles, CA
Type
conf
DOI
10.1109/ARMS.1988.196481
Filename
196481
Link To Document