Title :
Crane scheduling in batch annealing process
Author :
Xie, Xie ; Tang, Lixin
Author_Institution :
Inst. of Logistics, Northeastern Univ., Shenyang
Abstract :
In this paper, we study the crane scheduling problem of batch annealing process to minimize the last job completion (makespan). Some special characteristics of our crane scheduling are contrasted with that of existing two categories. We prove it to be strongly NP-hard and develop a resource assignment problem based heuristic algorithm in a bottleneck level. The heuristics is analysed from an absolute worst-case performance ratio of 3 and an asymptotic worst-case performance ratio is 2 respectively.
Keywords :
annealing; batch processing (industrial); cranes; optimisation; scheduling; NP-hard problem; batch annealing process; crane scheduling; resource assignment problem; Annealing; Coils; Cooling; Cranes; Furnaces; Heating; Job shop scheduling; Logistics; Steel; Temperature; Scheduling; absolute worst-case performance ratio; asymptotic worst-case performance ratio; batch annealing process; heuristics;
Conference_Titel :
Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
Conference_Location :
Qingdao
Print_ISBN :
978-1-4244-2502-0
Electronic_ISBN :
978-1-4244-2503-7
DOI :
10.1109/ICAL.2008.4636494