DocumentCode :
3001282
Title :
Planning and control for a warranty service facility
Author :
Messih, Amir ; Enns, S.T.
Author_Institution :
Div. of Power Quality Solutions, Eaton Corp., Calgary, Alta., Canada
fYear :
2005
fDate :
4-7 Dec. 2005
Abstract :
A warranty service facility for industrial products that also provides internal support by reworking production defects is considered. An important concern is the evaluation of policies for how technicians with flexible skills should be moved between the service facility and adjacent production facility. Relevant measures include warranty cycle times and the overall technician utilization levels. An approach is developed that allows incoming warranty work loads to be monitored using control charts. Workload information is then used in simulating behavior using different "flexing" policies. As well, warranty cycle times are monitored using control charts. Results indicate the approach is of practical interest and can be effectively.
Keywords :
control charts; facilities planning; monitoring; service industries; control charts; warranty service facility control; warranty service facility planning; warranty work load monitoring; Condition monitoring; Control charts; Costs; Customer service; Discrete event simulation; Manufacturing industries; Marketing and sales; Process planning; Production facilities; Warranties;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2005 Proceedings of the Winter
Print_ISBN :
0-7803-9519-0
Type :
conf
DOI :
10.1109/WSC.2005.1574493
Filename :
1574493
Link To Document :
بازگشت